For the iconic Parisian structure, two huge hydraulic cable lifts were designed to run on rail tracks in order to work with the tower’s sharp curvature. Additionally, when re-engineering the tower’s lift system, two OTIS lifts were installed to create the longest open-air run covered by a lift—525 feet. Each consists of two cabins acting as each other’s counterweight.
Share article
Tags
This inquiry form is for companies and organizations